Factory Refurb and Transfer

Operations relocation project for a leading electronics enclosure manufacturer in Suffolk. Two manufacturing sites and distribution operation converging on one site.

FLOOR PLAN 3D.png

Previously unoccupied office space taken back to the bricks. New layout designed in partnership with the client. 

Office 008.jpg

Replacement roof lights in high-bay warehouse and assembly areas. Industrial epoxy floor paint covering throughout.

Assembly 007.JPG

120,000 sq.ft. warehouse, production area, assembly, offices, and welfare. Full refurbishment and plant transfer.

​

Warehouse 003.JPG

New high-efficiency LEDs throughout, carpeting, redecoration and office furniture, to house 60+ multi-functional staff.

Office 012.JPG

Roof and gutter repairs. Re-wiring, extraction and ducting for fabrication and digital printing plant.

Assembly 002.JPG

Production Line Relocation (Italy // China)

Introduction of high-efficiency gas boiler production line to Songjiang District, Shanghai.

02.jpg

Trouble-shooting with Quality Assurance colleagues from Bassano, Italy.

06.jpg

Final touches being made. Additional fans for staff welfare in the soaring humidity...

08.jpg

Temporary production line for electro-mechanical sub-assembly!

05.jpg

Bespoke end-of-line test and maintenance hydraulic rig.

03.jpg

Project duration including design, logistics, and planning ~18 months.

IMG_1713.JPG